<strong id="ufm1a"><ruby id="ufm1a"></ruby></strong>

  • <output id="ufm1a"></output>
    <pre id="ufm1a"></pre>
    <blockquote id="ufm1a"></blockquote>
    少妇撒尿一区二区在线视频 ,免费无码成人AV片在线,亚洲日韩性欧美中文字幕,图片区小说区av区,国产一区二区三区黄色大片,国产精品中文av专线,无码精品人妻一区二区三区中,天堂网av最新版在线看
    Muen
    News

    News

    Enterprise service provider

    location : Home > News > Technical information

    What to check before the soft starter is powered on?

    2023-05-20 11:27:04

    Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


    The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


    First, check the wiring


    1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


    2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


    3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


    4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


    2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


    Third, check the motor


    1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


    2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


    In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


    通用變頻器


    label

    QR code

    The public,

    Mobile station
    The public, Mobile station

    Contact

    未標題-8.png 0755-81719517
    未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
    未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

    Navigation

    Home          About

    Product      Case

    Solution      Service

    Job      News

    Contact          

    Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
    主站蜘蛛池模板: 久久精品国产99国产精品严洲| 日本不卡三区| 国产稚嫩高中生呻吟激情在线视频| 国产成人综合在线观看不卡| 国产高清在线不卡一区| 国产99久久精品一区二区| 2020久久国产综合精品swag| 国产精品制服丝袜无码| 亚洲乱妇老熟女爽到高潮的片| 亚洲中文一区二区av| 日韩中文字幕在线不卡一区| 国内不卡的一区二区三区| 亚洲国产成人无码电影| 国产999久久高清免费观看| 中文字幕有码无码AV| 免费国产好深啊好涨好硬视频| 在线观看中文字幕国产码| 久久精品国产亚洲av忘忧草18| 一道本AV免费不卡播放| 一区二区三区日本久久九| 国产精品一级久久黄色片| 欧美在线观看www| 亚洲av第二区国产精品| 国产精品精品一区二区三| 国产一区二区三区自拍视频| 亚洲天堂av日韩精品| 日韩V欧美V中文在线| 日韩精品一区二区三区中文无码| 国产在线乱子伦一区二区| a4yy私人毛片| 91亚洲国产成人久久精| 国产精品色三级在线观看| 亚洲人成电影网站色mp4| 久久这里有精品国产电影网| 国产999精品2卡3卡4卡| 丰满少妇内射一区| 天天做天天爱夜夜爽导航| 日本黄页网站免费观看| 国产精品午夜福利导航导| 国产精品v片在线观看不卡| 亚洲欧洲一区二区综合精品|