1. <sup id="13zgi"></sup>
        少妇撒尿一区二区在线视频 ,免费无码成人AV片在线,亚洲日韩性欧美中文字幕,图片区小说区av区,国产一区二区三区黄色大片,国产精品中文av专线,无码精品人妻一区二区三区中,天堂网av最新版在线看
        Muen
        News

        News

        Enterprise service provider

        location : Home > News > Technical information

        What to check before the soft starter is powered on?

        2023-05-20 11:27:04

        Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


        The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


        First, check the wiring


        1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


        2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


        3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


        4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


        2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


        Third, check the motor


        1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


        2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


        In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


        通用變頻器


        label

        QR code

        The public,

        Mobile station
        The public, Mobile station

        Contact

        未標題-8.png 0755-81719517
        未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
        未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

        Navigation

        Home          About

        Product      Case

        Solution      Service

        Job      News

        Contact          

        Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
        主站蜘蛛池模板: 日日噜噜夜夜狠狠久久无码区| 亚洲av日韩在线资源| 国产一区二区在线视频播放| 精品国产这么小也不放过| 成人永久免费A∨一级在线播放| 国产内射XXXXX在线| 精选国产av精选一区二区三区| 色婷婷亚洲婷婷7月| 亚洲女同在线播放一区二区 | 91密桃精品国产91久久| 国产乱码精品一区二区三| 亚洲视频欧美不卡| 久久久一本精品99久久精品66直播 | 最近免费中文字幕大全| 成人特黄A级毛片免费视频| www亚洲天堂| 国产av午夜精品福利| 91pao强力打造免费高清| 亚洲一区二区精品偷拍| 成人日韩av不卡在线观看| 亚洲无人区视频在线观看| 果冻传媒在线看免费高清| 视频一区二区三区四区久久| 亚洲精品岛国片在线观看| 久久99精品久久久久麻豆| 亚洲av无码精品色午夜| 国产精品美女一区二三区| 婷婷国产亚洲性色av网站| 人人爽人人爽人人片a免费| 欧洲精品久久久AV无码电影| 久久久久国产一级毛片高清板| 十八禁午夜福利免费网站| 国产成年无码aⅴ片在线观看| 国产免费一区二区不卡| 久久18禁高潮出水呻吟娇| 久久国产成人av蜜臀| 亚洲av午夜精品无码专区| 亚洲欧美日韩综合久久久| 久久久久久亚洲精品不卡| 成人免费乱码大片a毛片| 中文有码人妻字幕在线|