1. <sup id="13zgi"></sup>
        少妇撒尿一区二区在线视频 ,免费无码成人AV片在线,亚洲日韩性欧美中文字幕,图片区小说区av区,国产一区二区三区黄色大片,国产精品中文av专线,无码精品人妻一区二区三区中,天堂网av最新版在线看
        Muen
        News

        News

        Enterprise service provider

        location : Home > News > Technical information

        What to check before the soft starter is powered on?

        2023-05-20 11:27:04

        Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


        The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


        First, check the wiring


        1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


        2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


        3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


        4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


        2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


        Third, check the motor


        1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


        2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


        In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


        通用變頻器


        label

        QR code

        The public,

        Mobile station
        The public, Mobile station

        Contact

        未標題-8.png 0755-81719517
        未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
        未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

        Navigation

        Home          About

        Product      Case

        Solution      Service

        Job      News

        Contact          

        Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
        主站蜘蛛池模板: 国产精品老熟女免费视频| 69人妻精品中文字幕| 2021国产成人精品久久| 亚洲的天堂在线中文字幕| 欧美亚洲另类自拍偷在线拍| 黄色大全免费看国产精品| 免费视频成人片在线观看| 99久久精品午夜一区二区 | 四虎影视一区二区精品| 污污污污污污WWW网站免费| 久久人妻国产精品| 伊人久久大香线蕉综合影院| 国产中文99视频在线观看| 亚洲欧美日韩成人综合网| 国产老妇伦国产熟女老妇高清| 国产无遮挡无码视频在线观看| 熟女乱一区二区三区四区| 精品久久人人做爽综合| 永久免费AV无码国产网站| av天堂久久天堂色综合| 久热99热这里只有精品| 国精品91人妻无码一区二区三区| 亚洲欧美日本久久网站| 亚洲国产成人久久精品app| 国产裸体美女视频全黄| 在线观看AV永久免费| 久久亚洲精品人成综合网| 人妻少妇偷人精品一区| 91麻豆国产精品91久久久| 亚洲中文字幕综合网在线| 夜夜爽夜夜叫夜夜高潮| 亚洲天堂男人天堂女人天堂| 久久精品午夜视频| 亚洲国产码专区在线观看| 国产精品一区二区三区蜜臀| 精品少妇爆乳无码aⅴ区| 白白色发布永久免费观看视频| 久久精品国产色蜜蜜麻豆| 日本国产一区二区三区在线观看| 色综合天天操| 18禁无遮挡啪啪无码网站破解版|