<strong id="ufm1a"><ruby id="ufm1a"></ruby></strong>

  • <output id="ufm1a"></output>
    <pre id="ufm1a"></pre>
    <blockquote id="ufm1a"></blockquote>
    少妇撒尿一区二区在线视频 ,免费无码成人AV片在线,亚洲日韩性欧美中文字幕,图片区小说区av区,国产一区二区三区黄色大片,国产精品中文av专线,无码精品人妻一区二区三区中,天堂网av最新版在线看
    Muen
    News

    News

    Enterprise service provider

    location : Home > News > Technical information

    The bearing capacity of high-voltage inverter for external faults and the fault recovery time of equipment

    2023-05-20 13:35:30

    The influence of external fault on input side, such as bus voltage drop caused by external power grid fault, on the operation of high voltage inverter. A power plant unit in Guangdong Province once had such an accident: due to the transient fault of the external power grid, the auxiliary power bus voltage flickered and dropped, leading to the shutdown of the auxiliary frequency converter. Although the fault of the external power grid was removed quickly, the important auxiliary equipment driven by the frequency converter stopped, which led to the unit load rejection. Therefore, the re start function of instantaneous power failure should be a reliable guarantee to improve the bearing capacity of external fault of high-voltage inverter of auxiliary equipment of power plant.


    The influence of external faults on the output side, such as cable breakdown and short circuit, single-phase grounding or even phase to phase short-circuit fault on high-voltage inverter. The high-voltage inverter shall be equipped with single-phase grounding fault detection function, and set alarm or trip protection according to site conditions. According to statistics, there are about 20 sets of phase to phase short circuit fault caused by insulation damage of high-voltage motors in Guangdong Province every year. Although the relative probability is small, the impact of short-circuit current on the equipment of high-voltage inverter with extremely limited over-current capacity is huge, which may lead to serious fault of equipment damage. The bearing capacity and protection technology of high voltage inverter to output phase to phase short circuit is an important factor to be considered in equipment selection and equipment safety assurance.


    Equipment faults can be divided into two types: one is the fault that can be recovered instantly. Once the fault occurs, it can recover itself in a short time. The frequency conversion device with automatic speed tracking function can significantly improve the operation ability and reliability under such fault conditions. Some of the high-voltage inverters in Guangdong Province are frequently shut down when lightning strikes in thunderstorm season;


    The other is the recovery time of the device after permanent failure. The power unit modularization can replace the standby module in a short time, so that the equipment can resume operation in a short time.


    General purpose frequency converter


    label

    QR code

    The public,

    Mobile station
    The public, Mobile station

    Contact

    未標題-8.png 0755-81719517
    未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
    未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

    Navigation

    Home          About

    Product      Case

    Solution      Service

    Job      News

    Contact          

    Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
    主站蜘蛛池模板: 熟女激情乱亚洲国产一区| 亚洲国产天堂久久综合226114| 四虎永久在线精品免费看| 东京热高清无码精品| 成av人电影在线观看| AV秘 无码一区二| 午夜无码国产18禁| 久久夜色精品久久噜噜亚| 亚洲国产成人久久精品不卡| 日韩精品在线观看一二区| 亚洲色成人网站www永久下载| 国产精品无码久久久久AV| 97se亚洲综合自在线| 色伦专区97中文字幕| 91中文字幕在线一区| 精品亚洲欧美无人区乱码| 午夜性爽视频男人的天堂| 亚洲色一色噜一噜噜噜| 亚洲精品无码成人A片九色播放| 婷婷色香五月综合缴缴情香蕉| 国产精品亚洲国际在线看| 日韩成人高精品一区二区| 国产精品成人一区二区不卡| 国产精品熟女乱色一区二区| 99久久成人亚洲精品观看| 黑人巨大亚洲一区二区久| 极品蜜桃臀一区二区av| 国产亚洲精品第一综合麻豆| 免费看欧美日韩一区二区三区| 亚洲国产精品日韩AV专区| 成人免费xxxxx在线观看| 欧美18videosex性欧美tube1080 | 秋霞人妻无码中文字幕| 国产av仑乱内谢| 樱桃视频影院在线播放| 精品国产AV无码一区二区三区| 国产精品免费中文字幕| 秋霞电影网| 成人国产精品中文字幕| 深夜福利啪啪片| 97国产揄拍国产精品人妻|